IWA 33-3:2021
Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements
OVERVIEW
This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.
Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.
COMMENTS
-
PRODUCT DETAILS
Status | Current |
---|---|
Edition | 2021 |
No. of Pages | 80 |
ICS Classification | 27.140 Hydraulic energy engineering |
Committee | ISO/TMBG |
Available for Purchase | For sale in Singapore only |
Adoption | ISO |