IEC 61557-7:1997

Electrical safety in low voltage distribution systems up to 1000 V a.c. and 1500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence

OVERVIEW

Specifies requirements for measuring equipment applied to testing th e phase sequence in three-phase distribution systems. Indication of the phase sequence may be mechanical, visual and/or audible.

COMMENTS

-

PRODUCT DETAILS

Status Revised
Edition 1997
No. of Pages 15
ICS Classification 29.240.01 Power transmission and distribution networks in general
29.080.01 Electrical insulation in general
17.220.20 Measurement of electrical and magnetic quantities
Committee TC 85
Available for Purchase For sale in Singapore only
Adoption IEC : 0