SS IEC 61850-3:2025
Communication networks and systems for power utility automation – Part 3: General requirements
OVERVIEW
This part of IEC 61850 defines the general requirements, mainly regarding construction, design and environmental conditions for utility communication and automation IEDs and systems in power plant and substation environments. These general requirements are in line with requirements for IEDs used in similar environments, for example measuring relays and protection equipment.
COMMENTS
-
PRODUCT DETAILS
Status | Current |
---|---|
Edition | 2025 |
No. of Pages | 73 |
ICS Classification | 33.200 Telecontrol. Telemetering |
Committee | Electrical and Electronic Standards Committee |
Available for Purchase | Global |
Adoption | IEC 61850-3 : 2013 IDT |